719-486-1783

Scroll down to see samples of our work.

PROJECTS

Click on pictures to see large versions.

HISTORY

2012

Mountain Structures Shop Built 42′ x 60′ Quonset Hut

Roll-up-door Install
Installed large roll up door.

Coherex Phase 2
Installed HDPE piping, pumps, and concrete supports to commission the system.

Washbay Monitors
Installed welded 4” pipe and 4 new monitors at existing truck wash facility.

SDP Crane Access Platform
Installed owner furnished crane catwalk.

2011

Coherex Phase 1 Removed old water tank and electrical shed.  Installed 25’ x 30’ concrete spill containment and set new Coherex Tanks.

Mayflower Pipeline Investigation
Performed excavation and pipe testing activities on an existing 42” pipeline.

Buckley Powder Building
Provided general contractor services to build a 40’ x 60’ owner furnished steel building.  Installed foundation and set two silos for powder storage.

Lube Oil Tank Piping
Installed welded carbon steel piping for new Lube Oil Tanks ranging in size from  1 ½” to 3” diameter.

Chlorine Dioxide Building
Provided general contractor services to install a new chlorine dioxide treatment system (owner furnished).  Included enclosing and insulating an existing shed and process piping.

2010

Clarifier Weld Repair & Concrete Patching Performed maintenance work to fix damaged thickener arms and repair failing tie-holes.

Dry Cooler Structure
Installed sonotube footings, fabricated base, columning and roofing. Erected steel, placed new dry cooler, installed new carbon steel piping.

2007

PC2 High Fan Access Platform
Fabricated and installed 50′ L x 6′ W walkway 50′ in the air at an operational conveyor.

Arkansas river Project (Concrete Subcontractor)
Installed large concrete inlet and diversion structure and grouted riprap spillway.

2006

Mayflower Inlet Structure
Dewalered and excavated down to existing piplines. Installed large inlet structure with trash racks and slide gates.

2005

Henderson Mill
Conveyor belt scraper and air compressor piping upgrade.

2004

Climax Mine
3mill roof replacement at Climax mine.

2003

Miscellaneous
Miscellaneous steel buildings and concrete work.

2002

Henderson Mill
Mills 1-4 launders. Fabricate and install newlaunders.

2001

Start business LMDT roof repairs.

PAST PROJECTS

Seepage Vault Installation/2010
Installed 12 concrete vaults and 600′ of 3″ HPPE pipe to monitor seep water at local mine.

Platform and Cyclone Installation/2010
Installed sonotube footings, fabricated steel platform and stairs, and set new cyclone.

Foster Tower/2009
Fabricated and erected large hexagonal shaped platform.

Climax 2010 Project Support/2008
Assist and support Climax 2010 Project setup. Project included: sludge densification, plant modifications, 3mill ice dam for preventing ice damage, storke wastewater pump station, Arkansas Well pump station piping and pump replacement.

449 Augusta Drive/2008
Completed work on a 2500sq.ft. structural steel/straw bale home.

Clinton Reservoir Outlet Structure Remodel

REQUEST QUOTE